Staff Priorities - Fabio

From SCECpedia
Revision as of 17:13, 9 July 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Fling Study
  • Fixed Trac issue #77 (UCSB LP validation)
  • Met with Phil, discussed design ideas and priorities for Broadband development
  • Broadband science call
  • Trac issue #104: Environment variables select GF and validation directories: done, testing
  • Trac issue #82: Separate validation code from Greens Functions: done, testing

Today:

  • Fling Study
    • Verify scenario 124, generate tar file, and post data
    • Monitoring last running scenario
  • Fix issue in GP code where filenames are cut short in site response module
  • Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
  • Trac #104: Write sample scripts
  • Trac #82: Run more acceptance tests
  • Trac #84: User selectable Greens Functions
  • Continue sketching BBP workflow (component by component with input and output files)
  • Trac issue #128: Start work on Cruise Control setup

Blocked:

  • No

Followups:

  • No

Ongoing:

  • Look for ways to break up the GF directory layout, some ideas are:
    • Figure out how to separate the validation data from Greens Functions
    • Create separate validation package
    • Separate events from each other