Staff Priorities - Fabio

From SCECpedia
Revision as of 20:23, 13 July 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Got Python distribution moved in HPCC to /home/scec-00/opt
  • Trac #131: Improved parallel scripts at HPCC, need to run more tests and finish packaging
    • Ran Fling scenario 101 with new scripts, results are ok
  • Talked to Masha, got Cruise Control configuration files
    • Current Cruise Control installation on broadband.usc.edu needs a few extra packages, will ask John Yu
  • Trac issue #82: Separate validation code from Greens Functions: done, testing
    • UCSB and URS codebases run without problems
    • Running SDSU's acceptance tests to make sure nothing was broken (nr and lp finished already)
  • Trac #84: User selectable Greens Functions
    • Initial design and walk through the codebase
  • Trac issue #143: Fixed path length issues on URS pipeline
    • Testing, running validations
  • Trac issue #104: Environment variables select GF and validation directories: done, testing

Today:

  • Trac issue #131: Package new parallel running scripts and check them into svn as part of BBP
  • Trac #104: Write sample scripts
  • Trac #82: Finish last acceptance test (SDSU-la)
  • Trac #84: User selectable Greens Functions
  • Continue sketching BBP workflow (component by component with input and output files)
  • Trac issue #128: Continue working on Cruise Control setup
    • Waiting for John to install missing JAR file(s)

Blocked:

  • No

Followups:

  • Call with Phil @ 1:30pm
  • Broadband science call @ 2:00pm