Staff Priorities - Scott

From SCECpedia
Revision as of 17:23, 13 August 2012 by Scottcal (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Submitted SCEC abstract
  • Found UCVM 11.9 still built on Kraken, passed tests
  • Got UCVM 12.2 working, somehow, resubmitted test job
  • Modified jbsim3d to keep going with memcached errors
  • Got PP runs plots from Gideon, looks like zip jobs are taking a long time, added option to separate zip jobs into independent job

Today

  • Check on UCVM run, continue testing integrated DAX generator
  • Try another PP run, 40x240, with separated zip jobs and continuing through memcached errors
  • Check on test with emod3d-mpi v1.16.3
  • Get new version of geoproj_subs.c to Phil and Fabio

Blocked

  • Waiting on Kim to get info on desired runs

Follow-ups

  • No
  • Runs for Rob and Kim
  • Continue testing compiler optimizations
  • Run some I/O tests to get reference values


Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration