Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Tested the new gen_plots and gp_gof modules
- Added arias duration plot to the gen_plots module
- Exchanged e-mails with RG about changing the simulation run time
- e-mailed RK about scheduling phone call to discuss rerunning some Fling scenarios
Today:
- Test Arias Duration implementation, check code into svn
- Try running jbsim with different simulation windows
- Call with RK, PM
- Work on BBToolbox integration
Blocked:
- No
Followups:
- Cybershake call @ 11am
- RK, PM call @ 1:30pm