Staff Priorities - Fabio
From SCECpedia
Jump to navigationJump to searchContents
Yesterday:
- Tested new version of RotD50 code in the platform
- Few changes to the Fortran code
- Ran LOMAP GP and UCSB
- Results look fine with new RotD50
- Checked everything into svn
- Broadband science call
- Ran 50-realization LOMAP GP on HPCC
- Call with CG, what else is needed to finalize pipeline
- Band-pass filter for bias plot
- Another bias plot with station distance
Today:
- Run 1-station 8.2 fling
- 100s window size
- 150s window size
- Post 50-realization results
- BBToolbox integration
Blocked:
- No
Followups:
- No