Staff Priorities - Fabio

From SCECpedia
Revision as of 18:13, 29 November 2012 by Fsilva (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • Generated 30 and 50km SAs from all 4 GMPEs using FW's code
    • RG found issues in some source files, so it will have to be regenerated
  • Modified BBP pipeline to process GMPE validations
  • Ran GMPE comparison to check if new pipeline is working
    • Reported back to FW peak at every station at T=0.1s for the CY method
  • Exchanged e-mails with RG, CG, PS regarding parameters for GMPE
  • Exchanged e-mails with RG regarding CEUS event configuration
  • Loaded east GFs into BBP
  • Configured Saguenay validation package

Today:

  • Re-generate 30 and 50km SAs from all 4 GMPEs using FW's code
  • Parameterize several values in GP and SDSU pipeline
  • Respond to CA regarding bias plot code
  • Update UCSB code with JC's latest version

Blocked:

  • No

Followups:

  • No