Blue Waters
From SCECpedia
Jump to navigationJump to search
The table below summarizes the key parameters of the various Phases of the
Blue Waters system. Phase 2 is expected to go into production in Summer 2012,
and in Fall 2012, the Phase 3 system will have Kepler accelerators installed in the
XK nodes. For more details, see the newly revised Blue Waters PRAC wiki page:
https://wiki.ncsa.illinois.edu/display/BWpublic/User+Information