Staff Priorities - Scott

From SCECpedia
Revision as of 18:29, 22 February 2013 by Scottcal (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Blue Waters:
    • Committed AWP helper scripts to SVN
    • Continued testing AWP helper scripts - found and fixed bug in media code, rerunning AWP SGTs
    • Worked on workflow generating scripts
  • Stampede:
    • Run s351 PP with timing numbers to get performance comparison with Kraken - wow!
  • Kraken:
    • Selected a rupture for forward simulation - source 7, rupture 6
  • Produced site list + KML for CS Study 2.3, uploaded to wiki
  • UCERF3 meeting
  • Replied re: Stampede space

Today

  • Blue Waters:
    • Run post-AWP scripts when SGTs are complete
    • Continue work on workflow-generating scripts
  • Stampede:
    • Install and test AWP helper scripts
    • Test AWP SGT generation
    • Continue testing PP
  • Kraken:
    • Validate AWP WNGC SGTs when omplete
    • Configure forward RWG simulation
  • Add AWP helper scripts to DAX generator
  • Update Pegasus to get new output-dir
  • Email cybershake list to notify about CS Study 2.3 site list

Blocked

  • No

Follow-ups

  • Phil re: Jessica and Jim Brune's request, helping out Nico

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration