Staff Priorities - Masha

From SCECpedia
Revision as of 17:07, 24 May 2013 by Liukis (talk | contribs)
Jump to navigationJump to search

Current Activities

Yesterday

  • TD: new model submission from MIT
    • John created TD development image, Ji installed and compiled the codes on the image
  • csep-op server:
    • Discrepancy in logL results for EEPAS-0S_Combined forecast as reported by Max Schneider
      • Don't see reported -73 vs. -76 values, only 0.1% difference in logL results
      • Differences are due to the scale factor for the last test date being 0.989999
    • Finished archival of raw ANSS catalog data into SVN
  • CSEP Trac tickets:
    • DONE: #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests
    • #311 Add support for different evaluation tests schedules within the same forecast group
    • #312 Add support for 30-minutes forecasts

Today

CSEP

  • John asked if Matlab R2007a can be retired
    • TD testing center is using the license, asked John to install latest Matlab within TD image to run acceptance test for Rowena's model

csep-op:

    •  Re-processing to catch up with evaluation during 2 weeks of down time
    • Data request from Alvaro Gonzalez: to process missed one-day forecasts and latest results
  • CSEP Trac tickets:
    • Working on: #311 Add support for different evaluation tests schedules within the same forecast group
    • #312 Add support for 30-minutes forecasts

TODO

Blocked: None

Followups: with Phil on CSEP, TD, and EEW priorities

Responsiblities