Staff Priorities - Scott

From SCECpedia
Revision as of 17:31, 4 September 2013 by Scottcal (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Resumed 2s SA db insertion
  • Compared 1 Hz and 0.5 Hz SGTs, look good
  • Came up with ideas for reducing PP memory requirements
  • Calculated BW TEST curve with workflow tools, matches reference
  • Asked HPCC to add BW proxy to grid-mapfile

Today

  • Summary for Mats
  • Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
  • Test AWP-ODC-SGT GPU with modified output format
  • Work on poster
  • Monitor 2s SA db inserts
  • Retry UCVM
  • Try BBP when the RC is posted

Blocked

  • No

Follow-ups

  • CyberShake calls at 11
  • Skype with John Yu at 1

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration