Staff Priorities - Phil

From SCECpedia
Revision as of 06:39, 25 November 2013 by Maechlin (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • BW Call
  • Travel plans to AGU

Today:

  • HPCC talk on bhp
  • BBP iteration plan
  • Call with RWG 1:30pm
  • BBP Call

Blocked:

  • No

Followups:

Pending:

  • Formalize the simulation plans for NR
  • Call with SD and KO on dynamic rupture
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file