Staff Priorities - Phil

From SCECpedia
Revision as of 18:24, 26 November 2013 by Maechlin (talk | contribs)
Jump to navigationJump to search

Yesterday:

  • NCAR Report to TJ YC
  • Posted SC materials on wiki
  • Collected IDC report from SC13
  • Ergo eval
  • UCVM Paper review
  • OLCF follow-up

Today:

  • Setup High-F call for Wed
  • High-F call 11:30am
  • YC Call 2pm
  • SC to propose BW metrics from paper
  • Setup INCITE Startup Request Call

Blocked:

  • No

Followups:

  • No

Pending:

  • THJ and YC Call
  • NGA-E Plan link to THJ
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Call with SD and KO on dynamic rupture
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file