Talk:CSEP Working Group
From SCECpedia
Jump to navigationJump to searchCSEP2: 5-Year Plan
(Items listed in no particular order)
- Develop relationships with users
- Outreach
- Curated CSEP1 data set
- Evaluating simulation-based forecasts
- Ensemble models
- Fault-based forcasts
- Removing Poisson Assumption
- Improve code-base to be more flexible
- Including ground motions
- GMPE
- Simulation Based (i.e. BBP)