Difference between revisions of "HighF v14.12"

From SCECpedia
Jump to navigationJump to search
Line 113: Line 113:
 
|}
 
|}
  
File:LaHabra aftershocks.png
+
[[Image:LaHabra aftershocks.png|right|250px]][
 +
 
 +
 
  
 
== High-F VandV Exercise Planning Documents (2014) ==
 
== High-F VandV Exercise Planning Documents (2014) ==

Revision as of 18:49, 8 December 2014

High-F 14.12 Verification and Validation Exercise

This page collects information about a proposed high frequency verification and validation exercise. Planning started in Dec 2014.

Volume

The four corners are:

  • -119.288842 34.120549
  • -118.354016 35.061096
  • -116.846030 34.025873
  • -117.780976 33.096503

Volume size:

  • 180,000 m x 135,000 m x 61,875 m = 1.503e15 m3

Simulation Box / Velocity Model

Parameter Value Notes
Dimensions (km) 180 x 135 x 61.875
Bounding Box (LL) -119.288842 34.120549, -118.354016 35.061096, -116.846030 34.025873, -117.780976 33.096503
UCVM Version 14.3.0 No heterogeneities
Velocity Model Versions CVM-S4v26
Miniumum Vs 500 m/s
Samples per wavelength 8


Point Source Parameters

Parameter Value Notes
Event Name La Habra
Origin Time 2014/03/29 04:09:42.97 Source: En-Jui
Origin Location -117.930; 33.922; 5.0km Source: En-Jui
Strike/Dip/Rake 1 134/55/155 Source: En-Jui, initial
Strike/Dip/Rake 2 239/70/38 Source: En-Jui, based on review of aftershock sequence
Rise Time 0.75 s

Solver Parameters

Parameter Value Notes
Frequency 4.0 Hz
Simulation Length 70 s
Delta T 0.005
Plane Output Resolution 250m
I/O Print Rate every 10 steps
Station List TBD
Software Version TBD
LaHabra aftershocks.png

[


High-F VandV Exercise Planning Documents (2014)

High-F Project Plan (2012)

Related Entries