Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 9: Line 9:
 
** libraries, jbsim
 
** libraries, jbsim
 
* Sent SRF plots to PM
 
* Sent SRF plots to PM
 +
* BBP new disk hasn't arrived yet
 +
** BBP update postponed
  
 
== Today ==
 
== Today ==

Revision as of 17:01, 18 June 2015

Yesterday

  • Ran UCVM on BW again
    • cvms 4.26 500 cores, larger region with 0 rotation
    • Worked with DG for adding metadata, adjusting coordinates
    • Created new netcdf file
    • Loaded it into IRIS visualization tool
  • Updated GP method
    • libraries, jbsim
  • Sent SRF plots to PM
  • BBP new disk hasn't arrived yet
    • BBP update postponed

Today

  • Run revised NGA-West 2 testing
  • Look into SG's code parameters
    • Try to see which ones come from SRC file
    • Which other ones are needed...
  • Try RG's new rupture generator code and LF simulator
    • HPCC Part-A and Part-B
  • Return EEW computer to JY

Blocked:

  • No

Followups:

  • No

To Do:

Short Term

Broadband Platform

  • Update GP rupture generator - Total: 3 days
    • Sent Rob parameters - done
    • Integrate code - 1 day
    • Run tests for Part-A / Part-B - 2 days
  • Anderson GoF code from AS - Total: 3 days
    • Analyze code, dependencies, provide AS feedback: 1 day
    • Convert code to BBP module, add module to BBP workflow: 1 day
    • Test BBP platform, produce new metrics: 1 day
  • New BBToolbox version available from SDSU - Total: 3 days
    • Incorporate SDSU changes into BBToolbox: 1 day
    • Run Part-A/Part-B validations: 2 days
  • NGA-West 2 validation on BBP - Total: 6 days
    • Contact CG, collect input scenarios: 1 day
    • Write test code: 1 day
    • Run tests: 2 days
    • Review results: 2 days
  • Setup laptop as EEW machine in software lab - Total: 1 day
    • Erase laptop, install clean Mac OS X, install EEW software: 1 day
  • Integrate Rupture Generator code from SG - Total: 28 days
    • Review code, understand inputs/outputs, run outside platform: 1 day
    • Run Part-A problem using Matlab code, review results: 1 day
    • Migrate code into BBP Platform, convert Matlab code into Python/C/Fortran, test: 20 days
    • Run Part-A/Part-B validation exercise on HPCC: 5 days (contingent on code performance)

High-F

  • Set up High-F code repository - Total: 3 days
    • Collect codes from groups, scripts - 1 day
    • Select SVN/Github repository - 1 day
    • Create repository - 1 day
  • Understand how to map station location to grid point - Total: 2 days
    • Understand approaches used by AWP and Hercules to map station location to grid point - 1 day
    • Discuss with PM, DG, how to use UCVM to do this mapping - 1 day

Medium Term

  • Package GF generation code from RG into BBP Platform
  • New raytracing code for SDSU method
  • Update Anderson method