** met with SCEC-VDO dev team on progress, remaining tasks that must be wrapped up before the end of the program
 
** met with SCEC-VDO dev team on progress, remaining tasks that must be wrapped up before the end of the program
 
** helped hazards team improve smoothness of shakemaps from RSQSim ruptures
 
** helped hazards team improve smoothness of shakemaps from RSQSim ruptures
 +
* worked on loss calculations for UCERF3-ETAS catalogs
  
 
== Today: ==
 
== Today: ==

Revision as of 17:12, 25 July 2016

7/25/16

Yesterday:

  • lots of intern help
    • window-based probabilistic calculation for prob forecasting team
    • met with SCEC-VDO dev team on progress, remaining tasks that must be wrapped up before the end of the program
    • helped hazards team improve smoothness of shakemaps from RSQSim ruptures
  • worked on loss calculations for UCERF3-ETAS catalogs

Today:

  • intern meeting at 10:30, likely a lot more help
  • meet with Christine on CISM report
  • run UCERF3 comparisons with latest RSQSim catalog from Bruce
  • updates to ETAS simulation loss plots requested by Ned

Blocked:

no

Followups:

no

Lower priority or longer term tasks

  • once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3