Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 17: Line 17:
  
 
== Followups: ==
 
== Followups: ==
* BBP/HighF w/ FS 130-2pm
+
* BBP/HighF/GMSV w/ FS 130-2pm
  
 
== Pending: ==
 
== Pending: ==

Revision as of 16:32, 17 August 2016

Yesterday:

  • Web Telecons
  • Workshop talk response to Sanaz
  • PRAC annual report
  • GMSV call Friday


Today:

  • XAB Call 9am
  • Dynamic rupture call 1030
  • BBP Call 2pm
  • Precarious rock site requirements
  • PRAC report

Blocked:

  • No

Followups:

  • BBP/HighF/GMSV w/ FS 130-2pm

Pending:

  • ABF into CME codebase
  • Check on mis-labeled time series from NK
  • Toms' presidential address as SSA
  • Research ps tech

Related Entries