Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 9: Line 9:
 
*Regenerate Study 15.4 SGTs for the 23 broadband station sites.
 
*Regenerate Study 15.4 SGTs for the 23 broadband station sites.
  
*Generate grid for John Shaw.  Talked with Phil - present options to John of either 100m (so cal) or 175m (cen cal).
+
*Generate grid for John Shaw.  Talked with Phil - present options to John of either 100m (so cal) or 175m (cen cal). 500m harder to work with.  Email John and give options.
  
 
*Generate Z1.0, Z2.5 plots for Kevin.  Try reinstalling UCVM on BW so we can do this in parallel.
 
*Generate Z1.0, Z2.5 plots for Kevin.  Try reinstalling UCVM on BW so we can do this in parallel.

Revision as of 16:53, 5 July 2017

Yesterday

  • Respond to Mats's questionnaire about data integrity for Pegasus
  • Review 2017 IHPCSS proposal
  • Produce writeup on 2017 IHPCSS mentoring activities
  • Create and email link to images of Vp, Vs, Rho without cutoffs
  • Register and use ALCF token

Today

  • Regenerate Study 15.4 SGTs for the 23 broadband station sites.
  • Generate grid for John Shaw. Talked with Phil - present options to John of either 100m (so cal) or 175m (cen cal). 500m harder to work with. Email John and give options.
  • Generate Z1.0, Z2.5 plots for Kevin. Try reinstalling UCVM on BW so we can do this in parallel.
  • Reproduce Feng's results using ABF
  • Run tests with SBSM, USC, PAS with v5.2.3. Checked on BBP and found v5.2.2; try to determine difference.
  • Finish technical stats for Study 17.3
  • Check on Darshan profiling of Cori code
  • Work on RSQSim workflow tool
  • Work on CyberShake training guide
  • Respond to students @ SC

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration