Staff Priorities - Scott

From SCECpedia
Revision as of 18:23, 22 February 2012 by Scottcal (talk | contribs)
Jump to navigationJump to search

Yesterday

  • Compared SGTs from workflow SMALL site to by-hand SMALL site - looks fine
  • Submitted run testing theory about rotation
  • Tried Pegasus 4.0.0 with TEST curve, ran into issue, emailed Karan
  • Ran TEST curve with in-mem RV generation on Ranger, passed
  • Discovered slow performance of SGTMerge step with full-scale SGTs on Kraken
  • Checked results from profiling test on Kraken - some kind of corruption in TAU files, emailed Matt

Today

  • Adjusted SGT Merge parameters on Kraken, trying again - may need MPI I/O
  • Email Rob F2F ruptures, ask for thoughts
  • CyberShake call
  • Check newest run results with 3D issue
  • Finish interrupted PP runs on Ranger
  • Add memcached to in-memory RV generation
  • Try 27x weak scaling test on Kraken

Blocked

  • No

Follow-ups

  • CyberShake call

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration