Talk:CSEP Working Group

From SCECpedia
Revision as of 22:14, 14 February 2018 by Wsavran (talk | contribs) (→‎CSEP2 -- 5 Year Plan)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

CSEP2: 5-Year Plan

(Items listed in no particular order)

  • Develop relationships with users
  • Outreach
  • Curated CSEP1 data set
  • Evaluating simulation-based forecasts
  • Ensemble models
  • Fault-based forcasts
  • Removing Poisson Assumption
  • Improve code-base to be more flexible
  • Including ground motions
    • GMPE
    • Simulation Based (i.e. BBP)