CyberShake Meeting - 4 April 2012: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 4: | Line 4: | ||
*Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation. | *Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation. | ||
*Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0 | *Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0 | ||
== Agenda & Presentations == | |||
'''Introduction and Meeting Goals ''' | |||
*09:00 Welcome, Goals, and Objectives (T. Jordan) | |||
*09:15 Recent CyberShake Production Runs (S. Callaghan) | |||
*09:30 Analysis of CyberShake Results (F. Wang) | |||
*09:45 Discussion | |||
'''California UCERF3.0 PSHA Calculation''' | |||
*10:00 UCERF3.0 Developments (N. Field) | |||
*10:15 California CVM (P. Chen) | |||
*10:30 UCERF3.0 Extended ERF (R. Graves) | |||
*11:00 CyberShake Processing Code Status (P. Maechling) | |||
*11:15 Discussion | |||
*11:30 Break | |||
'''CyberShake Study Plans''' | |||
*11:45 Sensitivity Studies for CVM and Ruptures at 0.5Hz (T. Jordan) | |||
*12:00 Initial Northern California Hazard Curves (B. Aagaard) | |||
*12:15 Evaluation of 1.0Hz and 10Hz CyberShake Hazard Curves (T. Jordan) | |||
*12:30 Lunch | |||
'''HPC Requirements''' | |||
*13:30 California PSHA Calculation (S. Callaghan) | |||
*13:45 HPC Codes Developments | |||
**AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui) | |||
**Hercules (R. Taborda) | |||
**AWP-Graves (R. Graves) | |||
*14:45 Discussion | |||
*15:00 Break | |||
'''CyberShake on Blue Waters''' | |||
*15:15 Blue Waters (J. Alameda) | |||
*15:30 | |||
*15:30 Discussion and Next Steps (T. Jordan/G. Beroza) | |||
*16:00 Adjourn | |||
== CyberShake Meeting Agenda == | == CyberShake Meeting Agenda == | ||
## 1Hz SGT software | ## 1Hz SGT software | ||
### AWP-ODC | ### AWP-ODC | ||
Revision as of 19:25, 28 March 2012

CyberShake Meeting Goals
- Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
- Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0
Agenda & Presentations
Introduction and Meeting Goals
- 09:00 Welcome, Goals, and Objectives (T. Jordan)
- 09:15 Recent CyberShake Production Runs (S. Callaghan)
- 09:30 Analysis of CyberShake Results (F. Wang)
- 09:45 Discussion
California UCERF3.0 PSHA Calculation
- 10:00 UCERF3.0 Developments (N. Field)
- 10:15 California CVM (P. Chen)
- 10:30 UCERF3.0 Extended ERF (R. Graves)
- 11:00 CyberShake Processing Code Status (P. Maechling)
- 11:15 Discussion
- 11:30 Break
CyberShake Study Plans
- 11:45 Sensitivity Studies for CVM and Ruptures at 0.5Hz (T. Jordan)
- 12:00 Initial Northern California Hazard Curves (B. Aagaard)
- 12:15 Evaluation of 1.0Hz and 10Hz CyberShake Hazard Curves (T. Jordan)
- 12:30 Lunch
HPC Requirements
- 13:30 California PSHA Calculation (S. Callaghan)
- 13:45 HPC Codes Developments
- AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui)
- Hercules (R. Taborda)
- AWP-Graves (R. Graves)
- 14:45 Discussion
- 15:00 Break
CyberShake on Blue Waters
- 15:15 Blue Waters (J. Alameda)
- 15:30
- 15:30 Discussion and Next Steps (T. Jordan/G. Beroza)
- 16:00 Adjourn
CyberShake Meeting Agenda
- 1Hz SGT software
- AWP-ODC
- Hercules
- Graves
- 10Hz Stochastic
- 1Hz SGT software
- Blue Waters Status (Alameda)
- Simulation Planning
- Target Calculation Parameters (Sites,Hrs,TB,RP)
- HPC codes used
- Workflow tools
- Data Products Produced and Storage Plans
- Publication Development