Difference between revisions of "XSEDE 2016"

From SCECpedia
Jump to navigationJump to search
Line 27: Line 27:
  
 
*Image File: [http://hypocenter.usc.edu/research/XSEDE/XSEDE_2016_Images_v4.pptx Images and Captions in pptx file V4]
 
*Image File: [http://hypocenter.usc.edu/research/XSEDE/XSEDE_2016_Images_v4.pptx Images and Captions in pptx file V4]
 +
 +
== XSEDE Policy Changes ==
 +
The PI must describe the peer-reviewed science goal that the resource award will facilitate. These goals must match or be sub-goals of those described in the listed funding award for that year.
  
 
== XSEDE 2014 Documents ==
 
== XSEDE 2014 Documents ==
 +
 
*[http://hypocenter.usc.edu/research/XSEDE/XSEDE_2014 XSEDE 2104 Documents]
 
*[http://hypocenter.usc.edu/research/XSEDE/XSEDE_2014 XSEDE 2104 Documents]
  
 
== Related Entries ==
 
== Related Entries ==
 
*[[XSEDE]]
 
*[[XSEDE]]

Revision as of 00:13, 15 October 2015

XSEDE Renewal Research required Information:

  • Title: SCEC Petascale Research: An Earthquake System Science Approach to Physics-based Seismic Hazard Research (TG-MCA03S012)
  • Abstract: TBD
  • Keywords: Seismology, Hazards, Ground Motions, Geophysics
  • Principal investigator: Thomas H. Jordan
  • co-PIs: Philip Maechling
  • co-PIs: TBD
  • Field of science: Geophysics
  • Resources Requests:
    • Stampede: 1M SUs and 5 TB storage
    • Comet: 100K SUs and 5 TB storage

XSEDE Policy Changes

The PI must describe the peer-reviewed science goal that the resource award will facilitate. These goals must match or be sub-goals of those described in the listed funding award for that year.

XSEDE 2014 Documents

Related Entries