Difference between revisions of "CyberShake Meeting - 4 April 2012"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
+ | [[File:Full-state-rupture-ucerf3.png|256px|thumb|right|Fig 1:Regional-scale San Andreas rupture under consideration for UCERF3.0. (Image Credit: Kevin Milner (USC))]] | ||
+ | |||
+ | == CyberShake Meeting Goals == | ||
+ | # Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation. | ||
+ | # Develop computational methods and techniques will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0 | ||
+ | |||
== CyberShake Meeting Agenda == | == CyberShake Meeting Agenda == | ||
# Current CyberShake Results | # Current CyberShake Results | ||
Line 11: | Line 17: | ||
### Graves | ### Graves | ||
## 10Hz Stochastic | ## 10Hz Stochastic | ||
− | # Blue Waters Status | + | # Blue Waters Status (Alameda) |
# Simulation Planning | # Simulation Planning | ||
## Target Calculation Parameters (Sites,Hrs,TB,RP) | ## Target Calculation Parameters (Sites,Hrs,TB,RP) | ||
Line 18: | Line 24: | ||
## Data Products Produced and Storage Plans | ## Data Products Produced and Storage Plans | ||
## Publication Development | ## Publication Development | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Related Entries == | == Related Entries == |
Revision as of 17:53, 23 March 2012
CyberShake Meeting Goals
- Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
- Develop computational methods and techniques will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0
CyberShake Meeting Agenda
- Current CyberShake Results
- Production Run Simulation Summary
- Interpretation of CyberShake Results
- California UCERF3.0 PSHA Calculation
- California CVM
- UCERF 3.0 Extended ERF
- 1Hz SGT software
- AWP-ODC
- Hercules
- Graves
- 10Hz Stochastic
- Blue Waters Status (Alameda)
- Simulation Planning
- Target Calculation Parameters (Sites,Hrs,TB,RP)
- HPC codes used
- Workflow tools
- Data Products Produced and Storage Plans
- Publication Development