Difference between revisions of "CyberShake Meeting - 4 April 2012"

From SCECpedia
Jump to navigationJump to search
Line 4: Line 4:
 
*Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
 
*Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
 
*Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0
 
*Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0
 +
 +
 +
== Agenda & Presentations ==
 +
'''Introduction and Meeting Goals '''
 +
*09:00 Welcome, Goals, and Objectives (T. Jordan)
 +
*09:15 Recent CyberShake Production Runs (S. Callaghan)
 +
*09:30  Analysis of CyberShake Results (F. Wang)
 +
*09:45  Discussion
 +
 +
'''California UCERF3.0 PSHA Calculation'''
 +
*10:00 UCERF3.0 Developments (N. Field)
 +
*10:15 California CVM  (P. Chen)
 +
*10:30  UCERF3.0 Extended ERF (R. Graves)
 +
*11:00  CyberShake Processing Code Status (P. Maechling)
 +
*11:15 Discussion
 +
*11:30 Break
 +
 +
'''CyberShake Study Plans'''
 +
*11:45 Sensitivity Studies for CVM and Ruptures at 0.5Hz (T. Jordan)
 +
*12:00  Initial Northern California Hazard Curves (B. Aagaard)
 +
*12:15  Evaluation of 1.0Hz and 10Hz CyberShake Hazard Curves (T. Jordan)
 +
*12:30 Lunch
 +
 +
'''HPC Requirements'''
 +
*13:30 California PSHA Calculation (S. Callaghan)
 +
*13:45  HPC Codes Developments
 +
**AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui)
 +
**Hercules (R. Taborda)
 +
**AWP-Graves (R. Graves)
 +
*14:45 Discussion
 +
*15:00  Break
 +
 +
'''CyberShake on Blue Waters'''
 +
*15:15  Blue Waters (J. Alameda)
 +
*15:30 
 +
*15:30  Discussion and Next Steps (T. Jordan/G. Beroza)
 +
*16:00  Adjourn
  
 
== CyberShake Meeting Agenda ==
 
== CyberShake Meeting Agenda ==
# Current CyberShake Results
+
 
## Production Run Simulation Summary
+
 
## Interpretation of CyberShake Results
 
# California UCERF3.0 PSHA Calculation
 
## California CVM
 
## UCERF 3.0 Extended ERF
 
 
## 1Hz SGT software
 
## 1Hz SGT software
 
### AWP-ODC
 
### AWP-ODC

Revision as of 19:25, 28 March 2012

Fig 1:Regional-scale San Andreas rupture under consideration for UCERF3.0. (Image Credit: Kevin Milner (USC))

CyberShake Meeting Goals

  • Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
  • Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0


Agenda & Presentations

Introduction and Meeting Goals

  • 09:00 Welcome, Goals, and Objectives (T. Jordan)
  • 09:15 Recent CyberShake Production Runs (S. Callaghan)
  • 09:30 Analysis of CyberShake Results (F. Wang)
  • 09:45 Discussion

California UCERF3.0 PSHA Calculation

  • 10:00 UCERF3.0 Developments (N. Field)
  • 10:15 California CVM (P. Chen)
  • 10:30 UCERF3.0 Extended ERF (R. Graves)
  • 11:00 CyberShake Processing Code Status (P. Maechling)
  • 11:15 Discussion
  • 11:30 Break

CyberShake Study Plans

  • 11:45 Sensitivity Studies for CVM and Ruptures at 0.5Hz (T. Jordan)
  • 12:00 Initial Northern California Hazard Curves (B. Aagaard)
  • 12:15 Evaluation of 1.0Hz and 10Hz CyberShake Hazard Curves (T. Jordan)
  • 12:30 Lunch

HPC Requirements

  • 13:30 California PSHA Calculation (S. Callaghan)
  • 13:45 HPC Codes Developments
    • AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui)
    • Hercules (R. Taborda)
    • AWP-Graves (R. Graves)
  • 14:45 Discussion
  • 15:00 Break

CyberShake on Blue Waters

  • 15:15 Blue Waters (J. Alameda)
  • 15:30
  • 15:30 Discussion and Next Steps (T. Jordan/G. Beroza)
  • 16:00 Adjourn

CyberShake Meeting Agenda

    1. 1Hz SGT software
      1. AWP-ODC
      2. Hercules
      3. Graves
    2. 10Hz Stochastic
  1. Blue Waters Status (Alameda)
  2. Simulation Planning
    1. Target Calculation Parameters (Sites,Hrs,TB,RP)
    2. HPC codes used
    3. Workflow tools
    4. Data Products Produced and Storage Plans
    5. Publication Development

Related Entries