Difference between revisions of "CyberShake Meeting - 4 April 2012"

From SCECpedia
Jump to navigationJump to search
Line 15: Line 15:
 
*09:45  CyberShake Validation using PBR (G. Biassi/J. Donovan)
 
*09:45  CyberShake Validation using PBR (G. Biassi/J. Donovan)
 
*10:00  Analysis of Higher Frequency Hazard Curves (K. Olsen)
 
*10:00  Analysis of Higher Frequency Hazard Curves (K. Olsen)
*10:15  Northern California Hazard Curve evaluation process (B. Aagaard)
+
*10:15  Northern California simulation evaluations (B. Aagaard)
*10:15 Break
+
*10:30 Break
  
 
'''UCERF3.0 PSHA Calculation Elements'''
 
'''UCERF3.0 PSHA Calculation Elements'''
*10:30 UCERF3.0 versus UCERF2.0 (N. Field)
+
*10:45 UCERF3.0 versus UCERF2.0 (N. Field)
*10:45 CyberShake California CVM (P. Chen)
+
*11:00 CyberShake California CVM (P. Chen)
*11:00 UCERF3.0 Extended ERF (R. Graves)
+
*11:15 UCERF3.0 Extended ERF (R. Graves)
*11:15 CyberShake Processing Software (S. Callaghan)
+
*11:30 CyberShake Processing Software (S. Callaghan)
*11:30 Discussion
+
*11:45 Discussion
 
*12:00  Lunch
 
*12:00  Lunch
  
Line 33: Line 33:
 
*14:00 Workflows on Track 1 (M. Rynge)
 
*14:00 Workflows on Track 1 (M. Rynge)
 
*14:15 Blue Waters Status (J. Alameda)
 
*14:15 Blue Waters Status (J. Alameda)
*14:45 CyberShake Data products management (P. Maechling)
+
*14:45 CyberShake Data products management (P. Maechling)
 
*14:30 Discussion
 
*14:30 Discussion
  

Revision as of 22:52, 28 March 2012

Fig 1:Regional-scale San Andreas rupture under consideration for UCERF3.0. (Image Credit: Kevin Milner (USC))

CyberShake Meeting Goals

  • Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
  • Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0

Agenda & Presentations

Introduction and Meeting Goals

  • 09:00 Welcome, Goals, and Objectives (T. Jordan)
  • 09:05 CyberShake Overview (P. Maechling)
  • 09:15 Recent CyberShake Production Runs (S. Callaghan)

CyberShake Hazard Model Analysis

  • 09:30 Analysis of CyberShake Results (F. Wang)
  • 09:45 CyberShake Validation using PBR (G. Biassi/J. Donovan)
  • 10:00 Analysis of Higher Frequency Hazard Curves (K. Olsen)
  • 10:15 Northern California simulation evaluations (B. Aagaard)
  • 10:30 Break

UCERF3.0 PSHA Calculation Elements

  • 10:45 UCERF3.0 versus UCERF2.0 (N. Field)
  • 11:00 CyberShake California CVM (P. Chen)
  • 11:15 UCERF3.0 Extended ERF (R. Graves)
  • 11:30 CyberShake Processing Software (S. Callaghan)
  • 11:45 Discussion
  • 12:00 Lunch

Future HPC Software Developments

  • 13:00 AWP-ODC (K. Olsen)
  • 13:15 AWP-ODC-GPU (Y. Cui)
  • 13:30 Hercules (R. Taborda)
  • 13:45 AWP-Graves (R. Graves)
  • 14:00 Workflows on Track 1 (M. Rynge)
  • 14:15 Blue Waters Status (J. Alameda)
  • 14:45 CyberShake Data products management (P. Maechling)
  • 14:30 Discussion

CyberShake Computational Plans

  • 15:00 UCERF3.0 time-dependent and on-demand calculations (N. Field)
  • 15:15 Defining CyberShake computational phases (T. Jordan)
  • 15:30 Discussion and Next Steps (T. Jordan/G. Beroza)
  • 16:00 Adjourn

Related Entries