Difference between revisions of "EEW Evaluation"
From SCECpedia
Jump to navigationJump to search (Created page with '== Processing Flow == Current design is based on processing one or more trigger reports. Currently two types of trigger reports are supported CIT On Site, and ETH Virtual Seismol…') |
|||
Line 1: | Line 1: | ||
+ | == Performance Evaluation Summaries == | ||
+ | Two descriptions of performance summaries include: | ||
+ | * CISN Testing Document | ||
+ | * CTC Group Evaluation Collection | ||
+ | |||
+ | We separate the summaries into "Event" Summaries and "Catalog" Summaries where catalog means any set of earthquakes, and the summary must make it clear what criteria were used to define the catalog. | ||
+ | |||
+ | |||
== Processing Flow == | == Processing Flow == | ||
Current design is based on processing one or more trigger reports. Currently two types of trigger reports are supported CIT On Site, and ETH Virtual Seismologist. | Current design is based on processing one or more trigger reports. Currently two types of trigger reports are supported CIT On Site, and ETH Virtual Seismologist. |
Revision as of 02:39, 1 May 2011
Contents
Performance Evaluation Summaries
Two descriptions of performance summaries include:
- CISN Testing Document
- CTC Group Evaluation Collection
We separate the summaries into "Event" Summaries and "Catalog" Summaries where catalog means any set of earthquakes, and the summary must make it clear what criteria were used to define the catalog.
Processing Flow
Current design is based on processing one or more trigger reports. Currently two types of trigger reports are supported CIT On Site, and ETH Virtual Seismologist.
- Init CISN Station list, ANSS EQ catalog, ShakeMap catalog
- For each Trigger File
- Mapped to One or More ANSS Events and observed data from ShakeMap
- For each event in trigger file
- write event summary
- Add to catalog summaries
- write catalog summaries
ANSS Catalog Files
Software Download
CTC Software is posted in git repository on github. maechlin:ctc