Difference between revisions of "CyberShake Meeting - 4 April 2012"

From SCECpedia
Jump to navigationJump to search
Line 27: Line 27:
 
*12:30 Lunch
 
*12:30 Lunch
  
'''HPC Requirements'''
+
''' HPC Developments'''
*13:30 California PSHA Calculation (S. Callaghan)
+
*13:30 AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui)
*13:45  HPC Codes Developments
+
*13:45 Hercules (R. Taborda)
**AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui)
+
*14:00 AWP-Graves (R. Graves)
**Hercules (R. Taborda)
+
*14:15 Workflows on Track 1 (G. Mehta)
**AWP-Graves (R. Graves)
+
*14:30 Discussion
*14:45 Discussion
+
*14:45 Break
*15:00  Break
 
  
 
'''CyberShake on Blue Waters'''
 
'''CyberShake on Blue Waters'''
*15:15 Blue Waters (J. Alameda)
+
*15:00 Blue Waters Status (J. Alameda)
*15:30   
+
*15:15  Target CyberShake Calculations (Sites,EERF,CVM,RP)
*15:30 Discussion and Next Steps (T. Jordan/G. Beroza)
+
*15:30  Data products and publication planning (P. Maechling)
 +
*15:45 Discussion and Next Steps (T. Jordan/G. Beroza)
 
*16:00  Adjourn
 
*16:00  Adjourn
 
== CyberShake Meeting Agenda ==
 
 
 
## 1Hz SGT software
 
### AWP-ODC
 
### Hercules
 
### Graves
 
## 10Hz Stochastic
 
# Blue Waters Status (Alameda)
 
# Simulation Planning
 
## Target Calculation Parameters (Sites,Hrs,TB,RP)
 
## HPC codes used
 
## Workflow tools
 
## Data Products Produced and Storage Plans
 
## Publication Development
 
  
 
== Related Entries ==
 
== Related Entries ==

Revision as of 19:31, 28 March 2012

Fig 1:Regional-scale San Andreas rupture under consideration for UCERF3.0. (Image Credit: Kevin Milner (USC))

CyberShake Meeting Goals

  • Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
  • Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0


Agenda & Presentations

Introduction and Meeting Goals

  • 09:00 Welcome, Goals, and Objectives (T. Jordan)
  • 09:15 Recent CyberShake Production Runs (S. Callaghan)
  • 09:30 Analysis of CyberShake Results (F. Wang)
  • 09:45 Discussion

California UCERF3.0 PSHA Calculation

  • 10:00 UCERF3.0 Developments (N. Field)
  • 10:15 California CVM (P. Chen)
  • 10:30 UCERF3.0 Extended ERF (R. Graves)
  • 11:00 CyberShake Processing Code Status (P. Maechling)
  • 11:15 Discussion
  • 11:30 Break

CyberShake Study Plans

  • 11:45 Sensitivity Studies for CVM and Ruptures at 0.5Hz (T. Jordan)
  • 12:00 Initial Northern California Hazard Curves (B. Aagaard)
  • 12:15 Evaluation of 1.0Hz and 10Hz CyberShake Hazard Curves (T. Jordan)
  • 12:30 Lunch

HPC Developments

  • 13:30 AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui)
  • 13:45 Hercules (R. Taborda)
  • 14:00 AWP-Graves (R. Graves)
  • 14:15 Workflows on Track 1 (G. Mehta)
  • 14:30 Discussion
  • 14:45 Break

CyberShake on Blue Waters

  • 15:00 Blue Waters Status (J. Alameda)
  • 15:15 Target CyberShake Calculations (Sites,EERF,CVM,RP)
  • 15:30 Data products and publication planning (P. Maechling)
  • 15:45 Discussion and Next Steps (T. Jordan/G. Beroza)
  • 16:00 Adjourn

Related Entries