CyberShake Meeting - 4 April 2012

From SCECpedia
Revision as of 19:31, 28 March 2012 by Maechlin (talk | contribs)
Jump to navigationJump to search
Fig 1:Regional-scale San Andreas rupture under consideration for UCERF3.0. (Image Credit: Kevin Milner (USC))

CyberShake Meeting Goals

  • Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
  • Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0


Agenda & Presentations

Introduction and Meeting Goals

  • 09:00 Welcome, Goals, and Objectives (T. Jordan)
  • 09:15 Recent CyberShake Production Runs (S. Callaghan)
  • 09:30 Analysis of CyberShake Results (F. Wang)
  • 09:45 Discussion

California UCERF3.0 PSHA Calculation

  • 10:00 UCERF3.0 Developments (N. Field)
  • 10:15 California CVM (P. Chen)
  • 10:30 UCERF3.0 Extended ERF (R. Graves)
  • 11:00 CyberShake Processing Code Status (P. Maechling)
  • 11:15 Discussion
  • 11:30 Break

CyberShake Study Plans

  • 11:45 Sensitivity Studies for CVM and Ruptures at 0.5Hz (T. Jordan)
  • 12:00 Initial Northern California Hazard Curves (B. Aagaard)
  • 12:15 Evaluation of 1.0Hz and 10Hz CyberShake Hazard Curves (T. Jordan)
  • 12:30 Lunch

HPC Developments

  • 13:30 AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui)
  • 13:45 Hercules (R. Taborda)
  • 14:00 AWP-Graves (R. Graves)
  • 14:15 Workflows on Track 1 (G. Mehta)
  • 14:30 Discussion
  • 14:45 Break

CyberShake on Blue Waters

  • 15:00 Blue Waters Status (J. Alameda)
  • 15:15 Target CyberShake Calculations (Sites,EERF,CVM,RP)
  • 15:30 Data products and publication planning (P. Maechling)
  • 15:45 Discussion and Next Steps (T. Jordan/G. Beroza)
  • 16:00 Adjourn

Related Entries