CyberShake Meeting - 4 April 2012
From SCECpedia
Jump to navigationJump to searchCyberShake Meeting Goals
- Develop scientific and technical basis for integrating SCEC scientific products including UCERF3.0, CVM, and software into a SCEC CyberShake calculation.
- Develop computational methods and techniques that will enable us to scale-up a CyberShake 1.0Hz PSHA calculation to 5000 sites using UCERF3.0
Agenda & Presentations
Introduction and Meeting Goals
- 09:00 Welcome, Goals, and Objectives (T. Jordan)
- 09:15 Recent CyberShake Production Runs (S. Callaghan)
- 09:30 Analysis of CyberShake Results (F. Wang)
- 09:45 Discussion
California UCERF3.0 PSHA Calculation
- 10:00 UCERF3.0 Developments (N. Field)
- 10:15 California CVM (P. Chen)
- 10:30 UCERF3.0 Extended ERF (R. Graves)
- 11:00 CyberShake Processing Code Status (P. Maechling)
- 11:15 Discussion
- 11:30 Break
CyberShake Study Plans
- 11:45 Sensitivity Studies for CVM and Ruptures at 0.5Hz (T. Jordan)
- 12:00 Initial Northern California Hazard Curves (B. Aagaard)
- 12:15 Evaluation of 1.0Hz and 10Hz CyberShake Hazard Curves (T. Jordan)
- 12:30 Lunch
HPC Developments
- 13:30 AWP-ODC-SGT and AWP-ODC-GPU (Y. Cui)
- 13:45 Hercules (R. Taborda)
- 14:00 AWP-Graves (R. Graves)
- 14:15 Workflows on Track 1 (G. Mehta)
- 14:30 Discussion
- 14:45 Break
CyberShake on Blue Waters
- 15:00 Blue Waters Status (J. Alameda)
- 15:15 Target CyberShake Calculations (Sites,EERF,CVM,RP)
- 15:30 Data products and publication planning (P. Maechling)
- 15:45 Discussion and Next Steps (T. Jordan/G. Beroza)
- 16:00 Adjourn