Difference between revisions of "Comparison of CyberShake Studies"
From SCECpedia
Jump to navigationJump to searchLine 20: | Line 20: | ||
| [[CyberShake 1.4]] || August 25, 2011 - March 14, 2012 || Deterministic to 0.5 Hz + stochastic to 10 Hz, CVM-S4 and CVM-H 11.2 for PBR, SCSN, and near-SCSN sites, using G&P 2010 || 10 Hz stoch || G&P 2010 || CVM-S, CVM-H || 4824 || 90 || USC HPCC, TACC Ranger || || || 112M || || 112M || 40.0M || 4 TB || Broadband | | [[CyberShake 1.4]] || August 25, 2011 - March 14, 2012 || Deterministic to 0.5 Hz + stochastic to 10 Hz, CVM-S4 and CVM-H 11.2 for PBR, SCSN, and near-SCSN sites, using G&P 2010 || 10 Hz stoch || G&P 2010 || CVM-S, CVM-H || 4824 || 90 || USC HPCC, TACC Ranger || || || 112M || || 112M || 40.0M || 4 TB || Broadband | ||
|- | |- | ||
− | | [[CyberShake 1.0]] || April 16 - June 10, 2009 || 0.5 Hz hazard map in Southern California, CVM-S || 0.5 Hz || G&P 2007 || CVM-S || 1314 || 223 || TACC Ranger || 6,900,000 || 14,544 || 192M || 3.9M (Condor), 3952 (submitted to Ranger) || 190M || || 10.6 TB || PDAX with 80 sub-DAXes, clustering, Condor glideins with Corral, zip files, Run Manager | + | | [[CyberShake 1.0]] || April 16 - June 10, 2009 || 0.5 Hz hazard map in Southern California, CVM-S || 0.5 Hz || G&P 2007 || CVM-S || 1314 || 223 || TACC Ranger || 6,900,000 || 14,544 || 192M || 3.9M (Condor), 3952 (submitted to Ranger) || 190M || 98.9M || 10.6 TB || PDAX with 80 sub-DAXes, clustering, Condor glideins with Corral, zip files, Run Manager |
|- | |- | ||
| CyberShake 0.5 (post-processing only) || June 26 - July 18, 2008 || Initial calculation of hazard curves || 0.5 Hz || G&P 2007 || CVM-S || 528 || 9 || NCSA Mercury || 442,400 || 800 || 7.5M || || 22 (glideins) || 7.5M || 90 GB || PDAX with 80 sub-DAXes, clustering, Condor glideins, zip files | | CyberShake 0.5 (post-processing only) || June 26 - July 18, 2008 || Initial calculation of hazard curves || 0.5 Hz || G&P 2007 || CVM-S || 528 || 9 || NCSA Mercury || 442,400 || 800 || 7.5M || || 22 (glideins) || 7.5M || 90 GB || PDAX with 80 sub-DAXes, clustering, Condor glideins, zip files | ||
|} | |} |
Revision as of 19:35, 2 February 2022
Study Name | Date | Science Goals | Frequency | Rupture Variations | Velocity Model(s) | Makespan (hrs) | Number of sites | Machine | Core Hours | Max Processors | Tasks | Jobs | Output files produced | Seismogram Pairs | Output Data (time series, IMs) | Comments |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CyberShake Study 21.12 | December 15, 2021 - January 13, 2022 | RSQSim Southern California CyberShake study | 1 Hz | RSQSim | CVM-S4.26.M01 | 688.4 | 335 | OLCF Summit | 2.75M | 89376 (46% of Summit) | 102.9M | 25.7M | 1.9 TB | First RSQSim-based hazard map. | ||
CyberShake Study 18.8 | August 17, 2018 - March 28, 2019 | Northern California CyberShake study | 1 Hz | G&P 2014 | CCA-06/USGS Bay Area/CVM-S4.26.M01 | 3079.3 | 869 | NCSA Blue Waters, OLCF Titan | 120M | 262,704 | 18225 | 18065 | 6.3M | 202.8M | 14.4 TB | First Northern California study, increased smoothing zone to 20 km. |
CyberShake Study 17.3 | March 6, 2017 - April 6, 2017 | Central California CyberShake study with 1D and 3D velocity models | 1 Hz | G&P 2014 | CCA 1D, CCA-06 | 738 | 876 | NCSA Blue Waters, OLCF Titan | 21.6M | 101,472 | 15,581 | 15,581 | 15.2M | 284.8M | 10.7 TB | First Central California study, used CCA-06. Used minimum Vs of 900 m/s. |
CyberShake Study 15.12 | December 3, 2015 - April 28, 2016 | Adding stochastic (to 10 Hz) to Study 15.4 and calculating duration values | 10 Hz stoch | G&P 2014 | CVM-S4.26.M01 | 3527 | 336 | NCSA Blue Waters | 11.8M | 159.8M | 30.5 TB | Applied site amplification to both deterministic and stochastic seismograms, using a modified approach to calculate Vref. | ||||
CyberShake Study 15.4 | April 16 - May 24, 2015 | 1 Hz CyberShake map, with AWP-ODC-GPU, G&P 2014, CVM-S4.26, and new sites. Calculated RotD also. | 1 Hz | G&P 2014 | CVM-S4.26.M01 | 914 | 336 | NCSA Blue Waters, OLCF Titan (pilot jobs) | 37.6M | 237,984 | 5505 | 4372 | 7.1M | 159.8M | 7.7 TB | Used DirectSynth to reduce the number of post-processing tasks and cut I/O by 99.9%. |
CyberShake Study 14.2 | February 18 - March 4, 2014 | 4 hazard models: CVM-S4.26 with CPU, CVM-S4.26 with GPU, 1D model with CPU, and CVM-H, no GTL with GPU. | 0.5 Hz | G&P 2010 | CVM-S4.26, BBP 1D, CVM-H no GTL | 342 | 1144 | NCSA Blue Waters | 15.8M | 295,040 | 99.9M | 100707 (Condor), 29796 (submitted to Blue Waters) | 16M | 480.1M | 57 TB | Workflow job to generate AWP workflow to support dynamic number of cores, GPU and CPU executables, batched SeisPSA jobs |
CyberShake Study 13.4 | April 17 - June 17, 2013 | 4 hazard models: CVM-S and CVM-H with the RWG V3.0.3 SGT code and AWP-ODC-SGT. | 0.5 Hz | G&P 2010 | CVM-S, CVM-H | 716 | 1132 | NCSA Blue Waters (custom solution), TACC Stampede (Pegasus/Condor/Globus) | 10.8M (Blue Waters); 1.4M (Stampede) | 128,000 (Blue Waters); 17,600 (Stampede) | 470M (Stampede) | 21912 submitted to Stampede | 2264 (Blue Waters); 16M (Stampede) | 480.1M | 43 TB (Blue Waters), 12.3 TB (Stampede) | Hierarchical DAXes with 8 sub-DAXes, PMC, pipe forwarding, Handoff jobs from Blue Waters to Stampede, merged SeisPSA jobs, in-memory rupture variation generation |
CyberShake Study 2.2 (post-processing only) | October 8, 2012 - March 6, 2013 (with a break from October 16 - November 8) | Redid post-processing of CyberShake 1.0 with G&P 2010. | 0.5 Hz | G&P 2010 | CVM-S | 2976 | 217 | NICS Kraken | PMC, pipe forwarding | |||||||
CyberShake 1.4 | August 25, 2011 - March 14, 2012 | Deterministic to 0.5 Hz + stochastic to 10 Hz, CVM-S4 and CVM-H 11.2 for PBR, SCSN, and near-SCSN sites, using G&P 2010 | 10 Hz stoch | G&P 2010 | CVM-S, CVM-H | 4824 | 90 | USC HPCC, TACC Ranger | 112M | 112M | 40.0M | 4 TB | Broadband | |||
CyberShake 1.0 | April 16 - June 10, 2009 | 0.5 Hz hazard map in Southern California, CVM-S | 0.5 Hz | G&P 2007 | CVM-S | 1314 | 223 | TACC Ranger | 6,900,000 | 14,544 | 192M | 3.9M (Condor), 3952 (submitted to Ranger) | 190M | 98.9M | 10.6 TB | PDAX with 80 sub-DAXes, clustering, Condor glideins with Corral, zip files, Run Manager |
CyberShake 0.5 (post-processing only) | June 26 - July 18, 2008 | Initial calculation of hazard curves | 0.5 Hz | G&P 2007 | CVM-S | 528 | 9 | NCSA Mercury | 442,400 | 800 | 7.5M | 22 (glideins) | 7.5M | 90 GB | PDAX with 80 sub-DAXes, clustering, Condor glideins, zip files |